EXCAVATOR Archives - Cannon Auction Service

  • Stability of Slopes for Excavations in Different Soil

    🕑 Reading time: 1 minuteStability of slopes in open excavation in different soil condition along with the factors that control slope stability in open excavation are discussed. Fig.1: Various Excavation Condition Contents:Factors Affecting Slope Stability in Open ExcavationExcavation Slope Stability in Cohesive SoilsSlope Stability in Normally Consolidated SoilsSlope Stability in Stiff

    Learn More
  • Log Path Cut Into a Hill : 5 Steps (with Pictures

    Step 1: Clearing the Path. To start, I had to clear the hill of all the undergrowth. I cut up the downed trees, cleared the brush, and started cutting out all of the little shrubs and trees in the pathway. There were also a ton of old branches and brush from years past that I had put on the hill from other projects.

    Learn More
  • Cut and Fill Excavation for Road Construction on Hillside

    A 100m road is to be built on hill slope by cut and fill excavation. By referring to the drawings (Fig A), takeoff the quantities for excavation and filling. Calculations: Two lane road – 3.25m x 2 = 6.5m wide. Add 500mm wide paved shoulders (sidewalks) on both sides – 0.5m x 2 = 1.0m. Total width of road = 6.5 + 1 = 7.5m. Cut Area

    Learn More
  • Slope Cutting And Slope Cutting Techniques For Excavators

    Slope Cutting And Slope Cutting Techniques For Excavators Aug 04, 2018. 1, modified slope. At the station, put the two-arm bucket over your head, hit the broken top (close enough to it) and scratch down as you normally would. It's best not to scratch too close to the car.

    Learn More
  • Dozers Graders Scrapers Loaders Excavators Cranes

    20 = constant that represents 20 pounds per ton of vehicle weight per degree of slope. .learncivilengineering.com 4 Step 5. progressively cutting ditches to a depth of 3 feet. Excavator Trick of the Trade # 1: Step 1.

    Learn More
  • Chapter 15 Construction Survey Procedures

    Oct 18, 2004 · Figure 15-2B Hand Written Generated Slope Stake Notes There are various ways to slope stake a project, depending on which method you choose. They are listed as follows: • Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. • Conventional Method - Slope staking using a total station and data collector, setting

    Learn More
  • CHAPTER 5 SURFACE AND SLOPE PROTECTIVE MEASURES

    Serrations consist of steps of 60 to 120 cm (2 to 4 ft) cut vertically and horizontally along the normal, intended slope gradient. After treatment, the slope is seeded, fertilized, and mulched as discussed in Chapter 5.2.3. The steps provide improved seedbeds free of …

    Learn More
  • StepSafe | Excavation Access Steps | Groundforce Shorco

    StepSafe. StepSafe is a temporary, self-levelling, site stairway system that provides a quick and safe method of access/ egress to excavations, chambers and tanks or for negotiating slopes and embankments. The system operates in conjunction with Groundforce's Premier LadderSafe platform and the specific function of the unit is to provide a

    Learn More
  • How to Use an Excavator on Steep Slopes and Dirt?

    Apr 02, 2020 · If you must change direction on a slope, you should operate on a gentler, firmer slope. 8) Avoid crossing slopes as this may cause the machine to slip. 9) When working on a slope, do not turn it, because it is easy to cause the machine to tip over and slip because it is out of balance. Rotate and operate the boom carefully at low speeds.

    Learn More
  • CHAPTER 5 SURFACE AND SLOPE PROTECTIVE MEASURES

    Serrations consist of steps of 60 to 120 cm (2 to 4 ft) cut vertically and horizontally along the normal, intended slope gradient. After treatment, the slope is seeded, fertilized, and mulched as discussed in Chapter 5.2.3. The steps provide improved seedbeds free of …

    Learn More
  • When and how to cut stepped foundations on a sloping site

    Nov 02, 2018 · When there are significant changes in level on a building plot or, if the profile of a decent load-bearing strata slopes, it can be difficult to work out how to keep costs down when digging out foundations. If you're cutting into the slope then it can result in very deep excavations and a lot more money to cart away the spoil and replace it with concrete.

    Learn More
  • Ensure Safe, Effective Excavator Operation on Slopes | …

    Jan 04, 2017 · "An excavator is capable of climbing some pretty steep slopes," says Matt Hendry, product specialist, Hitachi and John Deere excavators. "When working on slopes, it takes a lot of extra care."

    Learn More
  • How to Cut Steps Into a Dirt Slope | Hunker

    Operating Excavators on Slopes - Equipment & Contracting

    Learn More
  • Excavation and embankment (cut and fill)

    Cut 2 Existing ground Existing ground To figure out what is the total net cut/fill between station 1+00 and 2+00. Step 1: figure out total cut/fill area per station. This is usually given. - STA 1+00 = Cut 1 area = 85ft2, Fill 1 area = 100ft2 - STA 2+00 = Cut 2 area = 140ft 2, Fill 2 area = 20ft Step 2: Use above formula to calculate the cut

    Learn More
  • Advice Sought on Cutting Correct Slope on Hillside Roads

    Be sure the tape measure is laying flat on the ground when you take your measurements. Next, decide how many steps you'd like to have. A standard step in the United States is 7 ¾ inches tall. Divide the height of your slope by 7 ¾ inches (or however many inches tall you've decided to …

    Learn More
  • Trenching and Excavation Safety - Occupational Safety and

    Other equipment needs. Employers can gather the information they need through jobsite studies, observations, test borings for soil type or conditions, and consultations with local officials and utility companies. This information will help employers determine the amount, kind, and cost of safety equipment they will need to perform the work safely.

    Learn More
  • Log Path Cut Into a Hill : 5 Steps (with Pictures

    Step 1: Clearing the Path. To start, I had to clear the hill of all the undergrowth. I cut up the downed trees, cleared the brush, and started cutting out all of the little shrubs and trees in the pathway. There were also a ton of old branches and brush from years past that I had put on the hill from other projects.

    Learn More
  • How to Figure Out Elevation Grade | How to Calculate Slope

    The process for measuring elevation as a percentage is the same as finding elevation change as a decimal, with one extra step. So, find the rise over run. In our example, it's 2 over 6 (2/6) – this is .33. Then simply multiply the decimal by 100 to find the percentage. In this case, 33%. A positive percentage indicates an upward slope.

    Learn More
  • How to mow steep slopes with a ride - OMC Power Equipment

    Sep 28, 2017 · Direction. For ride on mowers, go up and down (NOT side to side). This gives maximum traction to the drive wheels and lessens the risk of rolling. It also avoids the 'crabbing' that tends to happen when mowing crossways on any slope, where the heavy end of the machine keeps trying to slide downhill making slope mowing difficult.

    Learn More
  • Operating Excavators on Slopes - Equipment & Contracting

    Feb 24, 2020 · Even used excavators are expensive. Follow these tips to safely operate an excavator on even the steepest slopes. Experience Counts Working on a slope is not for the faint-hearted – or an inexperienced trainee. Only highly experienced operators should use an excavator on a slope.

    Learn More